Latest announcements
Three draft releases below, written from the show's own market data and structured for immediate edit. Each needs your approval and a named spokesperson quote before publication.
Capital Expo Sdn. Bhd. announces Africa's only platform for the steel value chain at Landmark Centre, Lagos, 16–18 November 2027, covering the full metallurgical value chain.
Market data behind the show — demand of ~10 Mt against 2.2 Mt of domestic output, with every figure published alongside its source.
Equipment specification and vendor qualification timelines for the region's two flagship projects, and what they mean for suppliers.
Release 01 · Launch announcement
For immediate release · 10 November 2026
MMS Africa 2027 launches as West Africa's first dedicated steel trade show
LAGOS, Nigeria — Capital Expo Sdn. Bhd. has announced MMS Africa 2027, the Africa International Metallurgy, Metal & Steel Industry Exhibition, to be held 16–18 November 2027 at Landmark Centre, Victoria Island, Lagos. The show is the first trade exhibition in West Africa dedicated to the complete steel value chain, from ironmaking and steelmaking through rolling, finishing and end-use products.
The 2027 edition targets 10,000 m² of gross exhibition space, 250 exhibiting companies from more than 25 countries and 8,000 trade visitors. As Africa's only platform for the sector, all scale figures are planning targets rather than historical performance, and the organiser publishes them as such across the show's website and documentation.
The commercial case rests on published market data. Nigeria's annual steel demand is estimated at approximately 10 million tonnes against actual output of around 2.2 million tonnes, with domestic self-sufficiency below 20% and an annual import bill cited at US$4 billion. Installed capacity of 11.14 million tonnes per year across 74 plants — of which roughly 40 are operating — points to a substantial re-commissioning and equipment procurement pipeline.
The show runs a conference programme alongside the exhibition floor, covering plant re-commissioning, green metallurgy pathways, ECOWAS market access under AfCFTA, automation and skills development. A hosted buyer programme brings pre-qualified purchasing decision-makers to the floor on a pre-scheduled basis.
Stand sales are open now, with early-bird rates available until 15 March 2027. Trade visitor registration is free and opens ahead of the show.
Media contact · exhibit@mms-africa.com · Phone to confirm
About Capital Expo Sdn. Bhd. · Insert the approved 100–200 word boilerplate
Release 02 · Market opportunity
For immediate release · 10 November 2026
The US$4 bn import gap: why international steel suppliers are looking at Lagos
LAGOS, Nigeria — Nigeria imports the majority of the steel it consumes. Annual demand of roughly 10 million tonnes sits against domestic output of approximately 2.2 million tonnes, leaving a structural gap filled from abroad at an annual cost cited at US$4 billion.
The constraint is not installed capacity. Nigeria has 11.14 million tonnes per year of capacity across 74 plants — enough, on paper, to exceed domestic demand. Roughly 40 of those plants are operating, putting capacity utilisation near 19.7%. The gap between installed and actual is a maintenance, consumables, automation and re-commissioning market.
Tariff policy reinforces the case. Metallurgical equipment attracts zero import duty, and agricultural and manufacturing machinery moved to 0% under the 2026 revision of the fiscal policy measures, alongside a three-to-five year tax holiday for qualifying investment.
MMS Africa 2027 convenes that market at Landmark Centre, Lagos, 16–18 November 2027. Unusually for a trade show website, the organiser publishes the source institution and year for every market figure it cites, together with a variance-correction note where published sources disagree.
Sources cited in this release · NSRMEA (2022) · Mysteel (Oct 2026) · Ministry of Steel Development (2024–26) · 2026 FPM tariff schedule. All figures to be re-verified before external distribution. Do not distribute until verified
Release 03 · Procurement window
For immediate release · 10 November 2026
2027 procurement window opens for Ajaokuta and Delta Steel restarts
LAGOS, Nigeria — Two of West Africa's largest steel assets move into their equipment phases during 2027. The Delta Steel restart carries a US$1.3 billion commitment by PSML, while the Ajaokuta revival enters contracting and procurement.
For suppliers, timing is the commercial issue. Equipment selection and vendor qualification typically complete 12–18 months before capacity comes on stream, and technical approval cycles run six to twelve months ahead of first order. A supplier that misses the qualification stage competes later on price for spare parts against an incumbent already written into the specification.
November 2027 falls inside that window. MMS Africa 2027, held 16–18 November at Landmark Centre, Lagos, is positioned as the qualification event — the point at which suppliers meet the operators, EPC contractors and procurement teams setting vendor lists.
Beyond the two flagship projects, the window extends across the region: steel project pipelines in Ghana, Côte d'Ivoire and Senegal, and infrastructure demand linked to Simandou development in Guinea, all draw on the same supplier base.
Project values other than the Delta Steel commitment are not yet independently verified. Confirm the Ajaokuta figure with you before distribution
All three releases are drafts written from the show's own market data. They carry placeholder quotes and unverified figures by design — publishing an unverified number in a press release is harder to retract than delaying the release.